Resources

Surf zone GI using ROV-mounted CPT

Surf zone GI using ROV-mounted CPT
30th January, 2019

Lankelma mounted a Neptune CPT unit onto the ROV to enable underwater CPTs to be performed. Read more

Magnetometer testing in London

Magnetometer testing in London
3rd January, 2019

The magnetometer cone was used to clear the London site for UXO ahead of other intrusive site activities.

Bespoke testing solutions in Mauritius

Bespoke testing solutions in Mauritius
3rd January, 2019

A project to increase storage capacity of a rockfill dam called for Lankelma to mobilise a short notice to carry…

Read more

Seismic testing and CPT for HS2 Phase One

Seismic testing and CPT for HS2 Phase One
3rd January, 2019

Lankelma developed a constant energy source to enable seismic shear wave damping analysis required for the track bed design of…

Read more

Testing off the quay wall

Testing off the quay wall
3rd January, 2019

Lankelma’s cantilever frame was utilised to carry out cone penetration testing up to 2m from a quay wall.

Mini crawler in York

Mini crawler in York
3rd January, 2019

The mini crawler was ideal for testing inside a warehouse where access and working area was restricted.

Boston Barrier Project

Boston Barrier Project
3rd January, 2019

As part of the £100 million Boston Barrier project, Lankelma were instructed to carry out overwater and onland site investigations.

Verifying soil mixing in Finland

Verifying soil mixing in Finland
3rd January, 2019

Canadian gold mining company Agnico Eagle Mines instructed Lankelma to carry out a specialist ground investigation in Finland.

Basement GI in Central London

Basement GI in Central London
12th November, 2018

Working in a low headroom car park, CPT was performed with the lubrication module to provide an indication of the…

Read more

Sign up to hear the latest news from Lankelma

ACCREDITATIONS