Lankelma’s road-rail truck completed several CPTs and installed a vibrating wire piezometer within the four-foot as part of a rail stabilisation project.
The 2014 winter weather resulted in landslips on a railway embankment which called for rapid mobilisation of Lankelma’s CPT rigs to evaluate the ground conditions.