Lankelma mounted a Neptune CPT unit onto the ROV to enable underwater CPTs to be performed. Read more
The magnetometer cone was used to clear the London site for UXO ahead of other intrusive site activities.
A project to increase storage capacity of a rockfill dam called for Lankelma to mobilise a short notice to carry…
Lankelma developed a constant energy source to enable seismic shear wave damping analysis required for the track bed design of…
Lankelma’s cantilever frame was utilised to carry out cone penetration testing up to 2m from a quay wall.
The mini crawler was ideal for testing inside a warehouse where access and working area was restricted.
As part of the £100 million Boston Barrier project, Lankelma were instructed to carry out overwater and onland site investigations.
Canadian gold mining company Agnico Eagle Mines instructed Lankelma to carry out a specialist ground investigation in Finland.
Working in a low headroom car park, CPT was performed with the lubrication module to provide an indication of the…
ACCREDITATIONS