Services
 

 
Supporting Information
 


 
 
Home > Lankelma Inc >  Hanford Nuclear Facility
Hanford Nuclear Facility
   

   
   
We mobilized our 30 ton CPT rig equipped with the unique EAPS (enhanced access penetration system) from our Houston office to the Hanford Nuclear Facility in eastern Washington state in late May. 
   
 
Well installation
 
The project consisted of two scopes of work, the first being the installation of five permanent 3 inch diameter
instrument wells to a depth of 70 feet below ground surface. 
  
 
Soil moisture/resistivity testing
   
The second phase included in-situ air permeability testing along with temperature, 
soil moisture content and resistivity testing coupled with typical CPT parameters including tip, sleeve and dynamic pore pressure readings.
   
This study will provide key insight into subsurface conditions at the area in question and assist the U.S. Dept of Energy in determining an effective remediation effort.
 

Hanford Nuclear Facility



> Lankelma Inc   


Ask an Expert:
Umesh Bachu
Email: umeshbachu@lankelma.com
contact Lankelma
tel: +44 (0)1797 280050

or use our contact form