Services
 

 
Supporting Information
 


 
 
Home >  >  Lankelma Visits City of Culture
Lankelma Visits City of Culture


Integrated Site Investigation


UK3, Lankelma’s combination track truck thrust machine visited Liverpool, City of Culture, to undertake a site investigation for the proposed Kings Dock Waterfront Development.  Unlike the adjacent and famous Albert Dock development, Kings Dock has been infilled with sand and silty sand and is now programmed for both residential and leisure development.

Cone penetration testing was selected as part of an integrated site investigation package to rapidly assess the thickness and quality of the sand infill deposits.  Due to the presence of granular made ground deposits that extended to a depth of 1.5 metres, each CPT test location was broken out using hydraulic hand tools prior to penetration testing.


Tests

In all, 55 
piezocone penetration probes, together with dissipation testing were performed to penetration depths of 15 metres.  The CPTU investigation was supplemented with four percussive cable tool boring rigs and two rotary drilling rigs.  The work was completed in six days.
 

 

Lankelma Visits City of Culture



contact Lankelma
tel: +44 (0)1797 280050

or use our contact form